Technical journal
How to prepare an ABB EH contactor RFQ
Do not request only “EH800” or “EH1200”
Use the full order code and photograph the main and coil labels. Include operational voltage, frequency, utilization category and the actual load.
Describe the switching duty
Motor starting, plugging, reversing, resistive heating and transformer loads create different stresses. State the switching frequency, expected starts per hour and ambient conditions.
List every accessory
- Auxiliary contact blocks
- Mechanical or electrical interlocks
- Surge suppression
- Terminal covers and connection kits
- Overload relay and upstream protection
This information lets the supplier quote the requested assembly instead of a visually similar base contactor.
Questions buyers often ask
Why is the coil code essential?
Similar contactor frames can use different control-voltage coils.
What is utilization category?
It describes the switching duty and load behavior used to select the device rating.
