← Media

Technical journal

How to prepare an ABB EH contactor RFQ

Do not request only “EH800” or “EH1200”

Use the full order code and photograph the main and coil labels. Include operational voltage, frequency, utilization category and the actual load.

Describe the switching duty

Motor starting, plugging, reversing, resistive heating and transformer loads create different stresses. State the switching frequency, expected starts per hour and ambient conditions.

List every accessory

  • Auxiliary contact blocks
  • Mechanical or electrical interlocks
  • Surge suppression
  • Terminal covers and connection kits
  • Overload relay and upstream protection

This information lets the supplier quote the requested assembly instead of a visually similar base contactor.

FREQUENTLY ASKED QUESTIONS

Questions buyers often ask

Why is the coil code essential?

Similar contactor frames can use different control-voltage coils.

What is utilization category?

It describes the switching duty and load behavior used to select the device rating.